CONTROLS

Programme Development, Tracking & Controls

A programme is only useful if it reflects reality. We build baselines from construction logic, link cost and time, and give you the dashboards and reporting to know exactly where you stand — before it becomes a problem.

FOUNDATIONS

Building the Baseline

Every programme starts with structure. We build baselines that are grounded in construction method, resource availability and realistic durations — not wishful thinking from a bid programme that was never meant to be built to.

  • Work Breakdown Structure (WBS) setup and coding
  • Activity logic, relationships and constraints
  • Calendars, shifts and non-working periods
  • Milestone schedules and key date tracking
  • Risk allowances, float analysis and critical path identification
What a Good Baseline Gives You

A properly built baseline is your commercial anchor. It defines the critical path, identifies where float exists, and gives you the foundation to measure progress, manage change and defend your position.

Without it, every delay discussion becomes an argument. With it, you have evidence.

VISUAL CONTROLS

4D Sequencing & 5D Cost-Loaded Programmes

4D Construction Sequencing

Synchro Pro 4D visualisation linked to programme
Pour sequence animation for concrete packages
Temporary works phasing and installation sequences
Logistics modelling — cranage, access, laydown
Progress visualisation for client and stakeholder reporting

5D Cost-Loaded Programmes

Cost-loaded programmes with S-curve cashflow
Earned Value Management (EVM) dashboards
Procurement scheduling tied to programme logic
Cost impact modelling for programme change
4D Sequence — Sample

4D construction sequence — viaduct substructure and superstructure phasing

REPORTING

Tracking, Reporting & Change Control

Progress reporting that means something. We track against the baseline, report earned value, and give project leadership the data they need to make decisions — not just the data that looks good.

  • Progress updates and statusing against the baseline
  • EVM dashboards — BCWP, BCWS, ACWP, CPI, SPI
  • S-curve reporting with forecast at completion
  • Change control and programme impact assessments
  • Recovery programmes and acceleration planning
Change Control

Programme change is inevitable. What matters is how you control it. Every change is assessed for time and cost impact, recorded against the baseline, and reported through the same EVM framework.

Recovery programmes and acceleration plans are built from the same logic — not invented under pressure in a meeting room.

TOOLS

Software & Platforms

Primavera P6

Enterprise-level programme development, critical path analysis, resource loading and multi-project environments

MS Project

Programme development, Gantt scheduling, baseline tracking and reporting for single-project environments

Synchro Pro

4D construction sequencing, visual planning, logistics simulation and stakeholder presentation

Excel / Power BI

EVM dashboards, S-curve reporting, cost-loaded tracking and bespoke progress visualisation

Need Programme Support?

Whether you need a baseline built, 4D sequencing for a bid, or EVM reporting on a live project — we can help.

Get in Touch